Sign In | Join Free | My components-electronic.com |
|
Brand Name : Medpharm
Model Number : LDR
Certification : ISO/CE/CCC
Place of Origin : China
MOQ : 1 unit
Supply Ability : 50 units per month
Delivery Time : within 20 working days
Packaging Details : Plywood box
Control system : PLC control
Heating source : Electric heating
alarm interlock devices : Ensure safe operation of the boiler
Key feature : User friendly HMI
LDR Split Electric Heating Steam Boiler With Automatic Operation Control
Key feature:
1. All electrical components with CE and CCC certification to ensure product safety and service life;
2. Each group of heating component is equipped with clustered flange connection, with independent design, simple structure, high mechanical strength, which is safe, reliable and easy for replacement.
3. Control mode is flexible, which can be set to manual or automatic mode, for single machine or several machine operating together;
4. Unique power switching function, which can be adjusted according to actual steam demand; 5. Automatic operation control, with water shortage, over voltage, phase loss, overheating, leakage and other protection, which can ensure security.
Technical Data:
Type | LDR0.1 | LDR0.15 | LDR0.2 | LDR0.3 | LDR0.5 | |
Project | Unit | |||||
Rated evaporation | t/h | 0.1 | 0.15 | 0.2 | 0.3 | 0.5 |
Rated working pressure | MPa | 0.7/1.0 | 0.7/1.0 | 0.7/1.0 | 0.7/1.0 | 0.8/1.0 |
Staturated steam temperature | ℃ | 170/193 | 170/193 | 170/193 | 170/193 | 184/193 |
Input Power | KW | 72 | 108 | 144 | 216 | 360 |
Input current | A | 108 | 162 | 216 | 324 | 540 |
Rated pressure | V | 3N AC 50Hz 380V | ||||
Power×Group | KW×P | 18×4 | 18×6 | 18×8/24×6 | 27×8 | 36×10 |
Main valve caliber | DN | 25 | 25 | 32 | 32 | 50 |
Safty valve caliber | DN | 25 | 25 | 25 | 25 | 25 |
Infall caliber | DN | 20 | 20 | 20 | 20 | 20 |
Sewage valve caliber | DN | 25 | 25 | 25 | 25 | 25 |
Overall size L | mm | 1050 | 1100 | 1280/1150 | 1300 | 1580 |
W | mm | 950 | 950 | 1150/950 | 1200 | 1350 |
H | mm | 1900 | 2050 | 2100/2050 | 2200 | 2600 |
(300KG/H-500KG/H is Split structure, with separate boiler control cabinet) | A mm | - | - | - | 1200 | 1200 |
B mm | - | - | - | 500 | 500 | |
C mm | - | - | - | 1800 | 1800 | |
Weight | kg | 280/350 | 330/400 | 450/530 | 680/740 | 980/1080 |
We can provide customized products for specific power supply in the world. |
System Installation Drawings
Product analysis picture :
1)LDR 100-200KG/H
2)LDR 300-500KG/H
![]() |
LDR Split Electric Steam Heat Boiler Automatic Operation Control CCC Certification Images |